Galena, AK – Water Treatment Facility Fire Restoration – Summer 2015
The Galena Water Treatment Facility sustained fire damage to approximately 20% of the structure, and suffered severe smoke damage throughout the entire building. This job consisted of rebuilding the damaged parts of the Water Plant and installing brand new state-of-the-art water treatment equipment. This Water Treatment Facility serves over 250 boarding students, and a main challenge of this project was maintaining operational status of the damaged Water Plant during reconstruction.