Galena, AK Water Treatment Facility Fire Restoration

The galena water treatment facility sustained fire damage to approximately 20% of the structure and severe smoke damage to the entire building. This job consisted of rebuilding the structure and 100% new water treatment equipment. The water treatment plant serves over 250 boarding students and water plant had to stay operational during entire re-construction.